Статья: Реконструкция парогенератора БКЗ-220-110 Жезказганской ТЭЦ ТОО Kazakhmys Energy

Внимание! Если размещение файла нарушает Ваши авторские права, то обязательно сообщите нам

11. FAKEL, forsunki [TORCH, nozzles.] [Electronic resource]// Sajt kompanii NPP «PROMA», - URL: http://www.promav.ru/production/forsunki-mazutnye/forsunki-fakel/ (accessed: 25.06.2019). [in Russian]

RECONSTRUCTION OF THE BKZ-220-110 STEAM GENERATOR OF ZHEZKAZ-GANSK CHPP OF “KAZAKHMYS ENERGY” LLP

Meshkov A.S.1, Zhabalova G.G.2, Onishchenko O.N.3, *, Lelikova O.N.4, Kamarova S.N.5

1 Boiler Development Department, KazEnergoMash Corporation LLP, Temirtau, Kazakhstan;

2, 3, 4, 5 Karaganda State Industrial University, Temirtau, Kazakhstan

Abstract. The article discusses the possibility of reconstructing BKZ-220-110 steam generator of the Zhezkazgan CHPP, where serious problems arose in ensuring the temperature regime of the third and fourth stages of the superheater after dismantling the screen superheater, as well as part of the first stage of the convective superheater. To solve the problems, reconstruction is proposed aimed at increasing steam production up to 240 t/h with Borlin coal as fuel raising the reliability of the boiler and reducing NOx emissions to less than 470 mg/nm3 where б = 1.4.

Keywords: thermal power station, boiler, nozzle system of upper and lower blast, pulverized coal and kindling burners.